1 active
1 filters active
Dataset Period2026-09
Project Intelligence
Petalz By Danube
A residential project located in Warsan First, standalone (not part of a public collection).
Change this period
2026-08 → 2026-09- -838 posMarket Rank
Intelligence layer
Transactions
5
Total value
AED 4.36M
Median ticket
AED 880.0K
Average ticket
AED 872.8K
Median PPSF
AED 970
Average PPSF
AED 895
Off-plan share
0.0%
Ready share
100.0%
Editorial insights
Strength
Represents 10.4% of all transactions in Warsan First — a materially significant project locally.
Observation
Median PPSF of AED 970 is -37.0% below Dubai — materially below the benchmark.
Risk
Prices at a -23.1% discount to the Warsan First area median — investigate underlying reasons before drawing conclusions.
Observation
Transactions are almost entirely ready-market (100.0% ready).
Risk
Only 5 transaction(s) match the current filters — metric reliability is limited.
Rule-based summary of calculated metrics. Not predictive, promotional or advisory. Not investment advice.
Monthly transaction trend
Filter-aware
Median PPSF trend
Filter-aware
Configuration mix
2 configurations
Off-plan vs Ready
By transactions
- Off-Plan
- Ready
| Metric | Project | Collection | Warsan First | Dubai |
|---|---|---|---|---|
| Median ticket | AED 880.0K | n/a | AED 859.1K | AED 1.39M |
| Median PPSF | AED 970 | n/a | AED 1,261 | AED 1,540 |
| Off-plan share | 0.0% | n/a | 72.9% | 46.9% |
| Transactions | 5 | n/a | 48 | 15,246 |
Project has no publicly-approved parent collection. Collection column is intentionally hidden.
Metrics derived from transactions matching this project's canonical raw name list. Collection benchmarks appear only when the parent collection is publicly approved.

