1 active
1 filters active
Dataset Period2026-09
Project Intelligence
ARBOR VIEW
A project by Ellington located in Arjan, standalone (not part of a public collection).
Change this period
2026-08 → 2026-09- +212 posMarket Rank
Intelligence layer
Transactions
6
Total value
AED 11.32M
Median ticket
AED 1.61M
Average ticket
AED 1.89M
Median PPSF
AED 1,728
Average PPSF
AED 1,647
Off-plan share
0.0%
Ready share
100.0%
Editorial insights
Strength
Median PPSF of AED 1,728 is +12.2% above Dubai — a premium-priced project.
Strength
Prices at a +23.9% premium to the Arjan area median.
Observation
Transactions are almost entirely ready-market (100.0% ready).
Risk
Only 6 transaction(s) match the current filters — metric reliability is limited.
Rule-based summary of calculated metrics. Not predictive, promotional or advisory. Not investment advice.
Monthly transaction trend
Filter-aware
Median PPSF trend
Filter-aware
Configuration mix
3 configurations
Off-plan vs Ready
By transactions
- Off-Plan
- Ready
| Metric | Project | Collection | Arjan | Dubai |
|---|---|---|---|---|
| Median ticket | AED 1.61M | n/a | AED 880.0K | AED 1.39M |
| Median PPSF | AED 1,728 | n/a | AED 1,395 | AED 1,540 |
| Off-plan share | 0.0% | n/a | 44.4% | 46.9% |
| Transactions | 6 | n/a | 304 | 15,246 |
Project has no publicly-approved parent collection. Collection column is intentionally hidden.
Metrics derived from transactions matching this project's canonical raw name list. Collection benchmarks appear only when the parent collection is publicly approved.

